Oil & Gas

Baker Hughes wins 1.1 GW power and cooling order to run high-density AI compute

Baker Hughes announced on 27 October 2026 a major integrated power generation order and a substantial cooling order for a major US technology company’s advanced computing development. The award includes 34 Frame 5 gas turbines, nine NovaLT16 turbines, BRUSH Power Generation generators and associated gears, providing approximately 1.1 GW of reliable, scalable power for AI model training, inference and physical AI workloads. Baker Hughes will also supply Chart dry coolers as part of a closed-loop cooling system designed for high-density AI workloads. Chairman and CEO Lorenzo Simonelli said the AI revolution runs on energy, and that Baker Hughes is building the energy systems to underpin the next era of industrial advancement.

What This Means for Business Leaders: Energy is now a strategic bottleneck for AI growth, and energy-technology suppliers that can bundle generation, cooling, grid stability and energy management have a distinct advantage. For industrial and energy executives, the lesson is to plan power and cooling together, early, rather than treating them as afterthoughts to a compute project. Organisations siting AI infrastructure should secure scalable, reliable power before committing to capacity.

Source: GlobeNewswire (Baker Hughes) — https://www.globenewswire.com/news-release/2026/10/27/3389634/0/en/major-u-s-technology-company-selects-baker-hughes-power-generation-and-cooling-solutions-to-scale-high-density-ai-compute.html